Advertisement
Blogs
Subscribe to ECN Magazine Blogs
View Sample

FREE Email Newsletter

ECN Daily

ISOFACE Digital Input Product Family for Industrial Control and Automation Systems

February 28, 2011 12:23 pm | by ECN Europe | Comments

The new ISOFACE Digital Input products expand Infineon Technologies’ product segment of galvanic isolated interfaces for industrial control and automation applications. The ISOFACE Digital Input product family ISO1I811T and ISO1I813T is demonstrated at EmbeddedWorld 2011 tradeshow in...

TOPICS:

Magma’s Titan and FineSim Validated for LFoundry iPDKs

February 28, 2011 12:22 pm | by ECN Europe | Comments

Magma Design Automation, a provider of chip design software, and LFoundry, the customer-specific manufacturer of choice for analog, mixed-signal and specialized technologies, today announced the LFoundry’s interoperable process design kits (iPDKs) are validated for use with the Titan...

TOPICS:

10.4-inch touchscreen panel PC family

February 28, 2011 12:21 pm | by ECN Europe | Comments

Input device specialist Hoffmann + Krippner has launched a family of IP65/NEMA-rated 10.4-inch touch screen industrial PCs that use the company’s innovative membrane input technology to support cost-effective front panel customisation in order volumes as low as just 20 units. …

TOPICS:
Advertisement

Thunderbolt Sideswipes USB3.0 – or does it?

February 28, 2011 5:03 am | by Eric Broockman, Alereon (www.alereon.com) | Comments

The big question is – will Thunderbolt kill USB3.0 before it has even begun to become popular? The simple answer is no.

TOPICS:

embedded world 2011

February 28, 2011 3:21 am | by ECN Europe | Comments

The embedded world Exhibition&Conference 2011 is all set for yet another record event. Around 790 exhibiting companies (international share 42%) – 7 % up on the previous event – from all over the world present their products and services at …

TOPICS:

Low cost laser distance sensor offers high reliability

February 28, 2011 3:21 am | by ECN Europe | Comments

The new optoNCDT ILR 1030 complements Micro-Epsilon’s existing range of economical, low cost distance measurement sensors. The new sensor offers a measuring range between 0.2m and 8m on diffuse reflective surfaces, even as high as 50m when using a reflector …

TOPICS:

Display and Input Unit with CAN interface

February 28, 2011 3:20 am | by ECN Europe | Comments

Simple control applications often require small and easy to use display and input units. For these type of applications Graf-Syteco offers the ARGOS K 1010 unit. The display and input unit is also ideally suited as additional unit in more …

TOPICS:

What Do You Love Most About Saving Energy?

February 25, 2011 10:31 am | by Energy Savers Blog | Comments

Love was in the air this week, and Energy Savers was no exception. Chris told us the many reasons he loves saving energy - and money - and some of the quick and easy ways it can be done.

TOPICS:
Advertisement

Airports Soar to New Heights with Alternative Fuels

February 25, 2011 10:30 am | by Energy Savers Blog | Comments

A recent flight to a conference inspired me to think about the impact of airports on our environment and society. Although modern planes have made it safe and fun to travel around the world, they use a vast amount of fuel. The petroleum used by the array of behind-the-scenes equipment,...

TOPICS:

How Do You Make Greener Transportation Choices?

February 25, 2011 10:30 am | by Energy Savers Blog | Comments

On Tuesday, Shannon told you about some innovations from airports, car rental companies, and taxi companies that reduce fuel use and provide some greener transportation options when you travel.

TOPICS:

AdvancedMC processor module AM5020 with Intel Core i7(5)

February 24, 2011 5:20 pm | by ECN Europe | Comments

Kontron announced today the introduction of its powerful double-width AdvancedMC processor module AM5020. Equipped with an Intel Core i7 Mobile processor and Intel Hyper-Threading technology, the new Kontron AM5020 can produce an amazing amount of computing power, with up to …

TOPICS:

Ultra-compact photocoupler(3)

February 24, 2011 4:23 pm | by ECN Europe | Comments

Toshiba Electronics Europe (TEE) has launched an ultra-compact, high-speed inverter-type photocoupler that features guaranteed extended temperature performance while complying with the reinforced isolation class requirements of international safety standards. The TLP708 is ideal for home...

TOPICS:

Hardware-based IEEE 1588v2 PTP IEC 61850-3 Ethernet Switches

February 24, 2011 3:28 pm | by ECN Europe | Comments

Accurate timing and synchronization is essential to achieving next-generation Smart Grids technologies for the power industry. Moxa’s PT-7728-PTP series switches, which support the IEEE 1588v2 protocol with hardware time stamping to deliver nanosecond-accurate synchronization over...

TOPICS:
Advertisement

Biomedical Signal Processor

February 23, 2011 1:20 pm | by ECN Europe | Comments

At the International Solid-State Circuit Conference (ISSCC2011), imec, Holst Centre and NXP presented a versatile ultra-low power biomedical signal processor, CoolBioTM, meeting the requirements of future wearable biomedical sensor systems. The biomedical signal processor consumes only...

TOPICS:

Energy efficiency, reliability and productivity

February 23, 2011 1:20 pm | by ECN Europe | Comments

The Siemens Drive Technologies Division will be using this year’s Hanover Fair as a platform to showcase the considerable progress made in its strategic three-pronged integration approach. “We are creating a seamless drive train, integrating it into the Siemens automation …

TOPICS:

Pages

X
You may login with either your assigned username or your e-mail address.
The password field is case sensitive.
Loading